Year 2015
10 Sep 2015 | Company News
Senvion, one of the world’s leading wind turbine manufacturers, and PLT engineering, company controlled by PLT energia Spa Group have concluded a contract for the delivery and installation of 16 wind turbines with a total rated power of 32.8 megawatts (MW) in Calabria. 16 Senvion MM92 turbines wi...
READ ALL

3 Sep 2015 | Company News
The DASA RÄGISTER certification institute has successfully completed the combined certification process BS OHSAS 18001: 2007, EN ISO 14001: 2004, EN ISO 9001: 2008 PLT engineering Srl, Engineering & Construction company of the PLT energia Group. Cesena, September 3, 2015 – PLT energia SpA a...
READ ALL

29 Jul 2015 | Installations
PLT energia has acquired the 100% of FAS Srl, company that owns an operating wind farm of an installed capacity of 2,55 MW located in the municipality of Catanzaro, in an highly windy area in synergy with other plants held by PLT energia. Milan, July 29th, 2015 – PLT energia SpA announces the acq...
READ ALL

16 Jun 2015 | Installations
With an installed capacity of 10 MW, Torre di Ruggiero is able to generate more than around 23,4 GWh per year. Milan, June 16th, 2015 – PLT energia SpA announces to have completed and connected Torre di Ruggiero (CZ) wind farm of 10 MW of installed capacity. Pierluigi Tortora, PLT energia CEO,...
READ ALL

1
2


This website uses its own and third-party cookies to improve navigation. Using the site is considered accepting the Cookie Policy More info

Accept