The main events that marked PLT energia’s history.
Dec 2017
PLT energia acquires from Podini Holding the portfolio of wind farm in operation for 81 MW and photovoltaic plant for 1 MW
May 2017
The 60 MW Tursi e Colobraro wind farm becomes operational
Apr 2017
Through its subsidiary "Dynamica S.r.l.", PLT energia signs a €38,1 million contract with a bank pools for the realization of the 22,55MW Simeri Crichi wind farm
Apr 2017
The 22,55MW Simeri Crichi wind farm becomes operational
Oct 2016
PLT puregreen was born, the first Italian company that produces and sells green energy only
Sep 2016
The Autorità Garante della Concorrenza e del Mercato attributes to PLT energia the legality Rating with the maximum three stars score
Jul 2016
DASA RÄGISTER renews PLT engineering certification of the Integrated Management System BS OHSAS 18001: 2007, EN ISO 14001: 2015, EN ISO 9001: 2008
Jun 2016
PLT energia, through its subsidiary "Tursi and Colobraro Wind Farm Srl”, subscribes with a pool of banks a contract for 74.1 million euros for the construction of 60 MW wind farm of Tursi and Colobraro
May 2016
PLT energia participates in the European Mid Small Cap Forum in London
May 2016
Powerservice turns into SpA, changes name into PLT puregreen SpA and starts activities for the sale of electricity to retail market
Apr 2016
PLT energia gives up to Enel Green Power a 40% held in the company Maicor Wind S.r.l, owner of two wind farms
Nov 2015
PLT energia takes part in the Small Cap Conference organized by the Italian Stock Exchange
Jul 2015
PLT energia acquires an operational wind farm of 2.55 MW from the company FAS S.r.l. (CZ)
Jun 2015
Torre di Ruggiero wind farm of 10 MW comes into operation
Jun 2015
PLT energia holds the conference “Finance in support of growth and development for enterprises” with the participation of leading figures from the world of finance and economy
Apr 2015
PLT energia takes part in AIM Investor Day with the patronage of the Italian Stock Exchange
Apr 2015
PLT energia bills itself at the so called database Multilateral Development Banks (MDBs)
Apr 2015
The Group acquires the authorizations for the construction of Tursi e Colobraro wind farm (MT) which, when fully operational, will have a total capacity of 60 MW with an awarded incentive tariff for 20 years
Apr 2015
In the first four months of the year, wind farms of SAV S.Maria company come into operation with a total capacity of 2.45 MW
Sep 2014
Dynamica S.r.l., company of the Group,srl wins the incentive tariff for 20 years in relation to the wind farm in Simeri Crichi (CZ)
Jul 2014
The new headquarters is inaugurated
Jun 2014
PLT energy is admitted PLT energia admitted to the negotiations on AIM Italia – Alternative Investment Market, the next June 4 negotiations start